1MW/2MWh Liquid Cooling C&I ESS

Shenzhen Ainergy Technology Co., Ltd.
Capacidad Nominal
314 Ah
Voltaje Nominal
832 V
Tecnología
LFP (LiFePO4)
Región
China China
Peso
25.000 kg
Configuración
Recipiente
Precio:
Desde
€124 / kWh
Precio por Pieza
Precio por Pieza
Cantidad Mínima 1+ Uds
Plazo de entrega 70 days
ESS-1000-2000kWh-L €258.000
Contactar con el Fabricante
Nota: Su Consulta se enviará directamente a Shenzhen Ainergy Technology Co., Ltd..
  • Container: original CATL battery pack with original BMS and inverter PCS all in one container

  • EMS: our own EMS with seamless communication with the energy storage inverter

  • Long life LFP: more than 10 years

Características del Producto

N.º de Modelo
ESS-1000-2000kWh-L
Precio/kWh
€123 / kWh
Precio (unidad)
€258.000 / Unidad
Configuración Recipiente
Tecnología Sistema de Almacenamiento LFP (LiFePO4)
Opciones de Montaje Piso
 
 
Voltaje Nominal
832 V
Ishlash Kuchlanish Diapazoni 650 - 949 V
Capacidad Nominal
314Ah@1hr
Energía Nominal
2090 kWh
 
Temperatura de Funcionamiento -30 ~ +55 ℃
 
Dimension (L*A*A)
2438x6058x2896 mm
Peso
25000 Kg
Clasificación IP IP54
Altitud maxima 2000 m
Método de enfriamiento Líquido
Comunicación RS485, Ethernet
Supervisión Pantalla, App
 
 
Voltaje AC Clasificada
400 V
Rango de frecuencia
45-65 Hz
Frecuencia
50, 60 Hz
Numero de fases de inyeccion
3
 
 
Descargar pdf del Fabricante
Ainergy — Ai Storage Technology for a Brighter Future!
Certifications
Project Case
Logo de Empresa

Shenzhen Ainergy Technology Co., Ltd.

Click to show company phone
www.szainergy.com
China China
Room 41, Building A1, Fuhai Information Port, Xinhe Community, Fuhai Subdistrict, Bao'an District, Shenzhen, Guangdong
location
Nota: Su Consulta se enviará directamente a Shenzhen Ainergy Technology Co., Ltd..
Descripción de la Empresa

Shenzhen Ainergy Technology Co., Ltd. focuses on BESS. CATL is our partner, and we use the CATL original battery pack with the CATL original BMS to make a BESS with our own inverter (PCS). Our R&D center is located in Shenzhen with around 50 people, and our manufacturing base is in Dongguan with around 200,000 square meters. So far, our BESS has been installed for more than 50 MWh, most of which are in Europe, including the Czech Republic, Germany, Austria, Ukraine, Poland, Hungary, and Slovakia. Our final goal: Ai Storage Technology For A Brighter Future!

Producto
Ainergy — Ai Storage Technology for a Brighter Future!
Products

High-Efficiency Revenue

Three-level topology design, with unit round-trip efficiency > 90%

High Quality

Original CATL battery packs with CATL BMS

Flexible Configuration

supporting up to 20 units in parallel, 314Ah high-energy-density cells reduce

Certifications
Project Case

3 mas series de Shenzhen Ainergy Technology Co., Ltd.‎

  • ESS-125-261kWh-L All-in-one
    €133 / kWh
    ESS-125-261kW...
    314 Ah
  • 2.5MW/5MWh Liquid Cooling ESS
    €129 / kWh
    2.5MW/5MWh Li...
    314 Ah
  • 261 PV ESS Integrated Unit
    261 PV ESS In...
    314 Ah