|
Precio por Pieza
|
|||
| Cantidad Mínima | 1-9 Uds | 10-49 Uds | |
| Plazo de entrega | 56 days | 70 days | |
| BRES-720-375 | €113.000 | €110.000 | |
| BRES-1200-625 | €182.000 | €178.000 | |
| BRES-2400-1250 | €347.000 | €340.000 | |
| N.º de Modelo |
|
|
|---|---|---|
| Garantía de Producto (Min) | 3 Años | |
| Configuración | Todo en uno | |
| Tecnología Sistema de Almacenamiento | LFP (LiFePO4) | |
| Regiones | UPS | |
| Opciones de Montaje | Piso | |
| Unidades Paralelas MáXimas | 10 | |
| Voltaje Nominal |
|
|
| Energía Nominal |
|
|
| Energía Utilizable |
|
|
| Peso |
|
|
| Clasificación IP | IP65,IP66 | |
| Altitud maxima | 4000 m | |
| Método de enfriamiento | Ventilador | |
| Comunicación | CAN, Ethernet | |
| Supervisión | App | |
CNTE, backed by CATL (Stock No: 300750), was established by our President, Huang Shilin, who is also a co-founder and served as Vice President/General Manager of CATL for over ten years. He is also No.2 biggest shareholder of CATL now. CNTE specializes in manufacturing Original CATL Cells/Packs for Commercial & Industrial applications (ranging from 200 kWh to 2 MWh) as well as Utility-Scale Battery Energy Storage Systems (BESS) (from 2 MWh to 200 MWh). Certificated with ISO 9001/14001/45001 CNTE currently boasts over 300 R&D engineers and an annual production capacity of 12 GWh.